Conair ploughs $10m into second Franklin manufacturing facility

The Conair Group is pouring $10 million into the expansion of its manufacturing operations in Franklin, Pennsylvania after its facility at 455 Allegheny Boulevard reached full capacity.

The additional 157,760 sq ft leased building will be located at 325 Buffalo Street in Franklin, with fabrication, computer numerically controlled machining and powder coating operations expected to begin there in early 2027.

The project, part of a move by Rich Shaffer, vice-president of vertical integration to expand Conair’s in-house manufacturing capabilities, is expected to create 126 new jobs over the next three years.

The group supplies auxiliary equipment and systems for plastics processors in North America and manufactures more than 450 products, with solutions spanning resin drying, conveying, blending, feeding, heat transfer, size reduction, downstream extrusion, and bulk handling and storage.

Phased approach to production

The volume and range of parts produced in-house at the new site will increase in phases throughout 2027 and 2028, with work prioritised to support production needs and strengthen manufacturing capabilities, the PiovanGroup-owned company said.

The investment, it added, is intended to support higher production volumes, accelerate the introduction of new products and shorten delivery times for existing equipment.

The additional capabilities would also allow Conair to coordinate more component production with equipment assembly and customer schedules.

Its existing facility will continue to assemble Conair products; however, the current fabrication team will switch to the new site once renovations are completed.

Conair received $805,000 Pennsylvania First funding and a $40,000 Workforce and Economic Development Network of Pennsylvania grant to train workers.

‘Higher-quality plastics parts’

“Our customers count on Conair for technology that helps them produce higher-quality plastics parts, improve efficiency, and meet demanding production requirements,” said Jon Lashley, executive vice-president of Conair.

“This investment expands our capacity to deliver that technology, bring new products to market faster, and respond to customers’ needs – from shorter delivery times to custom solutions for their applications. It gives us the resources to support our customers as their businesses evolve.”

Shaffer added: “We plan to begin fabrication, CNC machining, and powder coating in early 2027, then bring additional parts into production in phases as equipment is installed and teams are trained.

“This approach allows us to build capacity systematically and coordinate the new operation with our existing assembly facility.”

Conair operates within PiovanGroup North America, part of Italy-based Piovan Group, a global leader in the design and manufacture of industrial automation systems for the storage, transport, and processing of polymers, plastics powders, and food ingredients.

Conair Franklin Manufacturing Expansion Interior 2026
Conair ploughs $10m into second Franklin manufacturing facility

Related content

Latest news

Sponsored content

Conair ploughs $10m into second Franklin manufacturing facility

Sign up to our newsletter to stay in the loop

Weekly news bulletin and monthly round-up